Skip to content
AOI Earthworks & Civil

The record

Real sites. No renders.

Every frame below is an AOI site in South Australia — in progress and finished. Captions state the discipline; no invented project names, no stock. Some frames carry simulated ambient motion — the sites and photography are all our own.

Auger — post holes to depth
Geofabric down — commercial pad
Pad crew, fabric run
Spreading to the edge beam
Mobilised — machine and trailer on site
Clearing — roots out
Site clearing, tight access
Bulk excavation
Pad preparation, geofabric
Site strip in progress
Benching to level
Cut-fill balance
Drainage run, fall-tested
Stormwater in trench
Engineered retaining
Sleeper wall, drained
Wall line, benched site
Boundary line, steel post and panel
Fence line set-out
Finished line